Alpha Version · Cleanroom BOM & Capex Model

Fab Capex Estimator

Bottom-up · 自底向上:从 121 台设备 BOM 逐台计价加总

Scales modular cleanroom equipment count proportionally to target fab monthly capacity.
Building, cleanroom, UPW, power, gases, HVAC & AMHS share of total capex (Industry range: 20%–35%).
Accounts for regional labor, regulatory compliance, engineering timelines, and local supply chains.
Pilot Baseline Advanced Pilot Line Baseline Model
Litho Share: 77.0% WFE / 57.7% Capex
Baseline cleanroom sandbox: multi-generation R&D scanner deployment (2 High-NA + 3 Low-NA EUV) produces 77.0% WFE litho concentration alongside 18 etch/dep tools.
● Low Scenario (Conservative Minimum)
$2.24 B
Tool Equipment (WFE): $1.68 B
Facility & Infrastructure: $559 M
▲ High Scenario (Maximum Full-Spec)
$3.32 B
Tool Equipment (WFE): $2.49 B
Facility & Infrastructure: $831 M
Capital Allocation Breakdown (Median Scenario) Cleanroom WFE Equipment vs Facility Systems
Process Tools (WFE): 75.0%
Building & Cleanroom Shell: 8.3%
MEP, UPW, Gases & Power: 14.2%
AMHS Monorail Logistics: 2.5%
WFE Equipment by Process Bay 12 Categories
Facility Infrastructure Subsystems Top-Down Allocation

Cleanroom Tool BOM & Unit Cost Breakdown

121 tools aggregated across 103 models from twin/layout-default.json

Category Vendor & Model Count Unit Price (Low – High) Basis Subtotal (Low / Median / High) Action

⚠️ Engineering Assumptions & Methodology Caveats