Alpha Version · Cleanroom BOM & Capex Model
Fab Capex Estimator
Bottom-up · 自底向上:从 121 台设备 BOM 逐台计价加总
Scales modular cleanroom equipment count proportionally to target
fab monthly capacity.
Accounts for regional labor, regulatory compliance, engineering
timelines, and local supply chains.
● Low Scenario (Conservative Minimum)
$2.24 B
Tool Equipment (WFE):
$1.68 B
Facility & Infrastructure:
$559 M
★ Median Scenario (Recommended Baseline)
Industry Standard
$2.78 B
Tool Equipment (WFE):
$2.09 B
Facility & Infrastructure:
$695 M
▲ High Scenario (Maximum Full-Spec)
$3.32 B
Tool Equipment (WFE):
$2.49 B
Facility & Infrastructure:
$831 M
WFE Equipment by Process Bay
12 Categories
Facility Infrastructure Subsystems
Top-Down Allocation
| Category | Vendor & Model | Count | Unit Price (Low – High) | Basis | Subtotal (Low / Median / High) | Action |
|---|
⚠️ Engineering Assumptions & Methodology Caveats
- Baseline Prototype Line vs. High-Volume GigaFab: The 3D Digital Twin cleanroom layout represents a balanced modular prototype line (121 tools across all 18 bays). In commercial high-volume manufacturing (30k–50k WSPM), dry etch and thin-film deposition tools scale significantly faster than EUV scanners to resolve process bottlenecks.
- Statistical Extreme Stacking: Summing all minimums (Low) and all maximums (High) assumes correlated extremes across 100+ separate procurement negotiations. The Median Scenario represents the most mathematically robust baseline for engineering budget feasibility.
- Infrastructure & Subfab Boundary: Facility shares (20%–35%) are anchored to verified industrial data from TSMC Arizona, Kumamoto Fab 1, and Samsung Taylor disclosures, covering civil shell, UPW, gases, high-voltage power, HVAC FFU, and AMHS monorails.